Lune sewage map and spill data
13 storm overflows listed in the 2025 annual return name this water. All are operated by United Utilities. Check the latest company report for each outlet below.
- 13
- Outlet records
- 195
- Spills in 2025
- 818
- Recorded hours
- 13
- Linked to a live feed
2 records show monitor operation below 90%. Annual figures describe the whole of 2025, not today.
Outlets on Lune
Filter by the latest company report. The map follows the filters.
Filters apply to the map and list. Recent stops need a current report and a recorded stop time. They do not show whether water is safe.
Showing 10 of 13 outlets
Open full map- Bulk Road CSO (25097)Current status unknown
United Utilities · The Lune Estuary via the Mill Race Culvert
2025 annual record:17spills66.7hours - Cable Street Combined Sewer Overflow (Site ID 251H9) (LAN0020)Current status unknown
United Utilities · The Lune Estuary via Mill Race Culvert
2025 annual record:15spills23.4hours - Damside Screening ChamberCurrent status unknown
United Utilities · River Lune Estuary
2025 annual record:17spills66.2hours - Damside Screening Chamber CSOCurrent status unknown
United Utilities · The Lune Estuary, via Mill Race culvert
2025 annual record:18spills67hours - Lancaster Bus Station CSOCurrent status unknown
United Utilities · The Lune Estuary, via Mill Race culvert
2025 annual record:11spills60.3hours - Lancaster WwTWCurrent status unknown
United Utilities · River Lune Estuary
2025 annual record:21spills236.4hours - Lune Street Sewage PSCurrent status unknown
United Utilities · River Lune (Estuarine Waters)
2025 annual record:2spills0.7hours - Owen Road CSOCurrent status unknown
United Utilities · River Lune
2025 annual record:9spills12.5hours - Oxcliffe Road Pumping Station (Site ID 25006) (LAN0028)Current status unknown
United Utilities · The River Lune Estuary
2025 annual record:25spills39.1hours - Ramparts CSOCurrent status unknown
United Utilities · The River Lune Estuary
2025 annual record:5spills4.4hours
No outlets match these filters.
Most recorded spills in 2025
The highest 2025 counts among these outlets. A count is events, not volume or harm. Equal counts share a rank.
- 1Willow Lane Sewage P/S (25032)30spills
United Utilities
- 2Oxcliffe Road Pumping Station (Site ID 25006) (LAN0028)25spills
United Utilities
- 3Lancaster WwTW21spills
United Utilities
- 4Damside Screening Chamber CSO18spills
United Utilities
- 5Bulk Road CSO (25097)17spills
United Utilities · monitor coverage 71.1%, below 90%
Spills over time
The median outlet on Lune recorded 17 spills in 2025, against 11 across England.
10 outlets have a comparable count for both 2024 and 2025, with the monitor working at least 90% of each year. 2 recorded more spills, 8 fewer and 0 the same. Together they went from 216 to 153 spills, a fall of 29%.
Largest rises from 2024 to 2025
| Year | Outlets with a count | Total spills | Median per outlet | England median |
|---|---|---|---|---|
| 2025 | 13 | 195 | 17 | 11 |
| 2024 | 12 | 233 | 13 | 19 |
Earlier returns list fewer of these outlets, so totals are not comparable between years. The median per outlet and the like-for-like change are fairer comparisons. Counts are events, not volume.
All outlet records on Lune
13 outlet records in alphabetical order. Each link opens the outlet page with its latest report and annual history.
- Bulk Road CSO (25097)The Lune Estuary via the Mill Race Culvert · 17 spills in 2025
- Cable Street Combined Sewer Overflow (Site ID 251H9) (LAN0020)The Lune Estuary via Mill Race Culvert · 15 spills in 2025
- Damside Screening ChamberRiver Lune Estuary · 17 spills in 2025
- Damside Screening Chamber CSOThe Lune Estuary, via Mill Race culvert · 18 spills in 2025
- Lancaster Bus Station CSOThe Lune Estuary, via Mill Race culvert · 11 spills in 2025
- Lancaster WwTWRiver Lune Estuary · 21 spills in 2025
- Lune Street Sewage PSRiver Lune (Estuarine Waters) · 2 spills in 2025
- Owen Road CSORiver Lune · 9 spills in 2025
- Oxcliffe Road Pumping Station (Site ID 25006) (LAN0028)The River Lune Estuary · 25 spills in 2025
- Ramparts CSOThe River Lune Estuary · 5 spills in 2025
- Rosemary Lane CSOThe Lune Estuary, via Mill Race Culvert · 8 spills in 2025
- Scale Hall PSRiver Lune Estuary (via surface water sewer) · 17 spills in 2025
- Willow Lane Sewage P/S (25032)Lune Estuary · 30 spills in 2025
Sources and dates
Outlet locations, waterbody links and spill figures come from the Environment Agency 2025 event duration monitoring annual return. The latest company reports come from each operator’s live feed and carry their own dates. Waterbody ID: GB531207212100. The official waterbody record is a source lookup; its classification is not imported here.
Questions about Lune
- Which outlets are linked to Lune?
- The source links 13 outlet records to waterbody GB531207212100. The link comes from the annual return; it does not model where a discharge travelled.
- How many spills were recorded for Lune?
- 13 records report 195 spills in 2025 and 818 recorded hours. All listed records have a usable count. Outlets can discharge at the same time, so the hours are not the time the whole water was affected.
- Who is responsible for the outlets on Lune?
- United Utilities operates every listed outlet. Contact the operator or the official pollution service if you see a problem in the water.
- Which outlets on Lune are linked to a live feed?
- 13 of the 13 records are matched to a monitor in a company live feed. A link does not mean the monitor is working now. Use the status filters above to see the latest report for each outlet, with its date. The rest show annual figures only.
- How complete is the monitoring for Lune?
- 2 of the listed records have monitor operation below 90% for 2025. Events can be missed when a monitor is not working, so low counts from those outlets may understate activity.
- Does this show if Lune is safe?
- No. Event duration data does not measure bacteria, chemicals or current water quality. Use official local water-quality advice for that question.