Sewage Map

Shore Road Wastewater Network PS(Site ID 49065) (WLN0008)

Storm overflow operated by United Utilities. The source names Dunkirk Dib as the receiving water.

33
Spills in 2025
55.5
Recorded hours
99.5%
Monitor operation
2
Years listed

The reported spill count was 20 lower than in 2024. This compares event counts, not discharge volume.

Current status unknown

Checking the latest monitor report…

Open official annual data ↗

How it compares in 2025

Shore Road Wastewater Network PS(Site ID 49065) (WLN0008) recorded 33 spills in 2025. That is more than 77% of the 14,239 overflows in England with a reported figure, and ranks 3,116th nationally. Among United Utilities overflows it ranks 715th of 2,270; the median United Utilities overflow recorded 15 spills. On the RIBBLE_Transitional waterbody it ranks 8th of 52.

GroupRank by spillsMedian spillsMedian hours
This outlet–3355.5
England3,116th of 14,2391122.3
United Utilities715th of 2,2701529.1
RIBBLE_Transitional8th of 527.517.8

Rank 1 has the most spills. Equal counts share a rank. Only overflows with a reported count are ranked. Counts do not measure volume, so a higher rank does not mean more sewage.

Annual spill history

532024332025
From 2024 to 2025, the reported count went from 53 to 33 spills. The highest count was 53 in 2024 and the lowest was 33 in 2025.
YearSpillsDurationMonitor operationSource
20253355.5 hours99.5%Official data
202453109.5 hours99.8%Official data

A missing figure means the source did not provide a usable value. A zero is shown as zero. Monitor operation below 90% can make comparison less reliable.

Outlet details

Water company
United Utilities
Outlet type
Storm discharge at a pumping station
Permit
017081186
Activity reference
A1
Grid reference
SD4375023810
Waterbody ID
GB531207112400Official waterbody record ↗
Location source
Official annual grid reference
Location precision
About 1 metres
Location note
Unknown

About the name and type

The annual return lists this asset as “Storm discharge at pumping station”: storm discharge at a pumping station. The overflow is at a pumping station that moves sewage through the network.

The waterbody link opens the Environment Agency record for the exact ID in the return. It is a source lookup; we do not import its classification.

Where it is

The recorded position is about 1.6 km north of the Tarleton and Hesketh Bank reference point in the ONS built-up areas data.

Area and water pages

Check the official record

Public access to this outlet is unknown. Do not enter restricted land or use this page as a route guide.

Open official source ↗

Other outlet records nearby

Questions about Shore Road Wastewater Network PS(Site ID 49065) (WLN0008)

Who operates Shore Road Wastewater Network PS(Site ID 49065) (WLN0008)?
United Utilities is the operator named in the annual record. The permit reference is 017081186.
Where does Shore Road Wastewater Network PS(Site ID 49065) (WLN0008) discharge?
The source names Dunkirk Dib as the receiving water. This does not show how far a discharge travelled.
How many times did Shore Road Wastewater Network PS(Site ID 49065) (WLN0008) spill in 2025?
The 2025 return records 33 counted spill events and 55.5 hours of recorded discharge. Spills are counted with the 12/24-hour method, so this is not a count of every start signal.
Can I trust the 2025 figures for this outlet?
The monitor worked for 99.5% of the reporting period, so the annual figures cover most of the year. They still do not measure discharge volume.
Is Shore Road Wastewater Network PS(Site ID 49065) (WLN0008) discharging right now?
This record is linked to a company live feed. The panel above shows the latest report we hold, with its date. That report can be old, and the monitor can be offline, so check the date before relying on it. A report that no discharge is taking place is not a water-quality result.
How accurate is the map marker?
The marker comes from the grid reference in the official annual return, which is accurate to about 1 metres. It shows the recorded outlet position, not the extent of any discharge.
What kind of outlet is Shore Road Wastewater Network PS(Site ID 49065) (WLN0008)?
The annual return lists the asset type as “Storm discharge at pumping station”, which means storm discharge at a pumping station. The overflow is at a pumping station that moves sewage through the network.
How does Shore Road Wastewater Network PS(Site ID 49065) (WLN0008) compare with other overflows?
Shore Road Wastewater Network PS(Site ID 49065) (WLN0008) recorded 33 spills in 2025. That is more than 77% of the 14,239 overflows in England with a reported figure, and ranks 3,116th nationally. Among United Utilities overflows it ranks 715th of 2,270; the median United Utilities overflow recorded 15 spills. On the RIBBLE_Transitional waterbody it ranks 8th of 52. Ranks compare counted spill events only. They do not compare volume or harm.
Does zero spills mean the water was safe?
No. A zero means the annual return recorded zero counted spill events for this outlet and year. It is not a water-quality test, and pollution can come from other sources.