Sewage Map

Redburn Sewage Pumping Station

Storm overflow operated by Northumbrian Water. The source names Red Burn as the receiving water.

45
Spills in 2025
51.4
Recorded hours
99.7%
Monitor operation
2
Years listed

The reported spill count was 27 lower than in 2024. This compares event counts, not discharge volume.

Current status unknown

Checking the latest monitor report…

Open official annual data ↗

How it compares in 2025

Redburn Sewage Pumping Station recorded 45 spills in 2025. That is more than 85% of the 14,239 overflows in England with a reported figure, and ranks 1,994th nationally. Among Northumbrian Water overflows it ranks 152nd of 1,559; the median Northumbrian Water overflow recorded 11 spills. On the South Tyne from Tipalt Burn to Allen waterbody it ranks 2nd of 8.

GroupRank by spillsMedian spillsMedian hours
This outlet–4551.4
England1,994th of 14,2391122.3
Northumbrian Water152nd of 1,5591115.6
South Tyne from Tipalt Burn to Allen2nd of 8178.2

Rank 1 has the most spills. Equal counts share a rank. Only overflows with a reported count are ranked. Counts do not measure volume, so a higher rank does not mean more sewage.

Annual spill history

722024452025
From 2024 to 2025, the reported count went from 72 to 45 spills. The highest count was 72 in 2024 and the lowest was 45 in 2025.
YearSpillsDurationMonitor operationSource
20254551.4 hours99.7%Official data
202472128 hours99.9%Official data

A missing figure means the source did not provide a usable value. A zero is shown as zero. Monitor operation below 90% can make comparison less reliable.

Outlet details

Water company
Northumbrian Water
Outlet type
Storm discharge at a pumping station
Permit
232/1170
Activity reference
A1
Grid reference
NY7704864478
Waterbody ID
GB103023075532Official waterbody record ↗
Location source
Official annual grid reference
Location precision
About 1 metres
Location note
Unknown

About the name and type

The annual return lists this asset as “Storm discharge at pumping station”: storm discharge at a pumping station. The overflow is at a pumping station that moves sewage through the network.

The waterbody link opens the Environment Agency record for the exact ID in the return. It is a source lookup; we do not import its classification.

Where it is

The recorded position is about 0.3 km east of the Redburn reference point in the ONS built-up areas data.

Area and water pages

Check the official record

Public access to this outlet is unknown. Do not enter restricted land or use this page as a route guide.

Open official source ↗

Other outlet records nearby

Questions about Redburn Sewage Pumping Station

Who operates Redburn Sewage Pumping Station?
Northumbrian Water is the operator named in the annual record. The permit reference is 232/1170.
Where does Redburn Sewage Pumping Station discharge?
The source names Red Burn as the receiving water. This does not show how far a discharge travelled.
How many times did Redburn Sewage Pumping Station spill in 2025?
The 2025 return records 45 counted spill events and 51.4 hours of recorded discharge. Spills are counted with the 12/24-hour method, so this is not a count of every start signal.
Can I trust the 2025 figures for this outlet?
The monitor worked for 99.7% of the reporting period, so the annual figures cover most of the year. They still do not measure discharge volume.
Is Redburn Sewage Pumping Station discharging right now?
This record is linked to a company live feed. The panel above shows the latest report we hold, with its date. That report can be old, and the monitor can be offline, so check the date before relying on it. A report that no discharge is taking place is not a water-quality result.
How accurate is the map marker?
The marker comes from the grid reference in the official annual return, which is accurate to about 1 metres. It shows the recorded outlet position, not the extent of any discharge.
What kind of outlet is Redburn Sewage Pumping Station?
The annual return lists the asset type as “Storm discharge at pumping station”, which means storm discharge at a pumping station. The overflow is at a pumping station that moves sewage through the network.
How does Redburn Sewage Pumping Station compare with other overflows?
Redburn Sewage Pumping Station recorded 45 spills in 2025. That is more than 85% of the 14,239 overflows in England with a reported figure, and ranks 1,994th nationally. Among Northumbrian Water overflows it ranks 152nd of 1,559; the median Northumbrian Water overflow recorded 11 spills. On the South Tyne from Tipalt Burn to Allen waterbody it ranks 2nd of 8. Ranks compare counted spill events only. They do not compare volume or harm.
Does zero spills mean the water was safe?
No. A zero means the annual return recorded zero counted spill events for this outlet and year. It is not a water-quality test, and pollution can come from other sources.