Sewage Map

O/S 8 Hardy Drive CSO

Storm overflow operated by United Utilities. The source names Tributary River Chor as the receiving water.

99
Spills in 2025
196.5
Recorded hours
99.1%
Monitor operation
2
Years listed

The reported spill count was 28 lower than in 2024. This compares event counts, not discharge volume.

Current status unknown

Checking the latest monitor report…

Open official annual data ↗

How it compares in 2025

O/S 8 Hardy Drive CSO recorded 99 spills in 2025. That is more than 98% of the 14,239 overflows in England with a reported figure, and ranks 264th nationally. Among United Utilities overflows it ranks 78th of 2,270; the median United Utilities overflow recorded 15 spills. On the Yarrow DS Big Lodge Water waterbody it ranks 1st of 19.

GroupRank by spillsMedian spillsMedian hours
This outlet–99196.5
England264th of 14,2391122.3
United Utilities78th of 2,2701529.1
Yarrow DS Big Lodge Water1st of 191819.8

Rank 1 has the most spills. Equal counts share a rank. Only overflows with a reported count are ranked. Counts do not measure volume, so a higher rank does not mean more sewage.

Annual spill history

1272024992025
From 2024 to 2025, the reported count went from 127 to 99 spills. The highest count was 127 in 2024 and the lowest was 99 in 2025.
YearSpillsDurationMonitor operationSource
202599196.5 hours99.1%Official data
2024127201.7 hours95.8%Official data

A missing figure means the source did not provide a usable value. A zero is shown as zero. Monitor operation below 90% can make comparison less reliable.

Outlet details

Water company
United Utilities
Outlet type
Storm overflow on the sewer network
Permit
01CHR0018
Activity reference
A1
Grid reference
SD5732017020
Waterbody ID
GB112070064952Official waterbody record ↗
Location source
Official annual grid reference
Location precision
About 1 metres
Location note
Unknown

About the name and type

The annual return lists this asset as “SO on sewer network”: storm overflow on the sewer network. The return places this overflow on the sewer network.

The waterbody link opens the Environment Agency record for the exact ID in the return. It is a source lookup; we do not import its classification.

Where it is

The recorded position is about 1.1 km south-west of the Chorley reference point in the ONS built-up areas data.

Area and water pages

Check the official record

Public access to this outlet is unknown. Do not enter restricted land or use this page as a route guide.

Open official source ↗

Other outlet records nearby

  • 96 Collingwood Road CSO

    United Utilities · Clvrted Tributary River Chor

    Current status unknown
  • Lydd Grove PS

    United Utilities · Unnamed Tributary of River Chor

    Current status unknown
  • Parklands CSO

    United Utilities · River Chor Tributary River Yarrow

    Current status unknown
  • Common Bank Lane CSO

    United Utilities · River Chor Diversion Channel

    Current status unknown

Questions about O/S 8 Hardy Drive CSO

Who operates O/S 8 Hardy Drive CSO?
United Utilities is the operator named in the annual record. The permit reference is 01CHR0018.
Where does O/S 8 Hardy Drive CSO discharge?
The source names Tributary River Chor as the receiving water. This does not show how far a discharge travelled.
How many times did O/S 8 Hardy Drive CSO spill in 2025?
The 2025 return records 99 counted spill events and 196.5 hours of recorded discharge. Spills are counted with the 12/24-hour method, so this is not a count of every start signal.
Can I trust the 2025 figures for this outlet?
The monitor worked for 99.1% of the reporting period, so the annual figures cover most of the year. They still do not measure discharge volume.
Is O/S 8 Hardy Drive CSO discharging right now?
This record is linked to a company live feed. The panel above shows the latest report we hold, with its date. That report can be old, and the monitor can be offline, so check the date before relying on it. A report that no discharge is taking place is not a water-quality result.
How accurate is the map marker?
The marker comes from the grid reference in the official annual return, which is accurate to about 1 metres. It shows the recorded outlet position, not the extent of any discharge.
What kind of outlet is O/S 8 Hardy Drive CSO?
The annual return lists the asset type as “SO on sewer network”, which means storm overflow on the sewer network. The return places this overflow on the sewer network.
How does O/S 8 Hardy Drive CSO compare with other overflows?
O/S 8 Hardy Drive CSO recorded 99 spills in 2025. That is more than 98% of the 14,239 overflows in England with a reported figure, and ranks 264th nationally. Among United Utilities overflows it ranks 78th of 2,270; the median United Utilities overflow recorded 15 spills. On the Yarrow DS Big Lodge Water waterbody it ranks 1st of 19. Ranks compare counted spill events only. They do not compare volume or harm.
Does zero spills mean the water was safe?
No. A zero means the annual return recorded zero counted spill events for this outlet and year. It is not a water-quality test, and pollution can come from other sources.