Chorley New Road CSO
Storm overflow operated by United Utilities. The source names Tributary of Middle Brook as the receiving water.
- 12
- Spills in 2025
- 19.8
- Recorded hours
- 86%
- Monitor operation
- 2
- Years listed
Checking the latest monitor report…
How it compares in 2025
Chorley New Road CSO recorded 12 spills in 2025. That is more than 51% of the 14,239 overflows in England with a reported figure, and ranks 6,643rd nationally. Among United Utilities overflows it ranks 1,213th of 2,270; the median United Utilities overflow recorded 15 spills. On the Middle Brook waterbody it ranks 20th of 46.
The monitor worked for 86% of 2025, so this count may be low and its rank may understate activity.
| Group | Rank by spills | Median spills | Median hours |
|---|---|---|---|
| This outlet | – | 12 | 19.8 |
| England | 6,643rd of 14,239 | 11 | 22.3 |
| United Utilities | 1,213th of 2,270 | 15 | 29.1 |
| Middle Brook | 20th of 46 | 9 | 11.6 |
Rank 1 has the most spills. Equal counts share a rank. Only overflows with a reported count are ranked. Counts do not measure volume, so a higher rank does not mean more sewage.
Annual spill history
| Year | Spills | Duration | Monitor operation | Source |
|---|---|---|---|---|
| 2025 | 12 | 19.8 hours | 86%Low coverage | Official data |
| 2024 | 31 | 39.4 hours | 92.4% | Official data |
A missing figure means the source did not provide a usable value. A zero is shown as zero. Monitor operation below 90% can make comparison less reliable.
Outlet details
- Water company
- United Utilities
- Outlet type
- Storm overflow on the sewer network
- Permit
- 01BOL0097
- Activity reference
- A1
- Grid reference
- SD6874009330
- Waterbody ID
- GB112069064540Official waterbody record ↗
- Location source
- Official annual grid reference
- Location precision
- About 1 metres
- Location note
- Unknown
About the name and type
The annual return lists this asset as “SO on sewer network”: storm overflow on the sewer network. The return places this overflow on the sewer network.
The waterbody link opens the Environment Agency record for the exact ID in the return. It is a source lookup; we do not import its classification.
Where it is
The recorded position is about 2.4 km north-east of the Chew Moor reference point in the ONS built-up areas data.
Area and water pages
- Walkden area →
- Kearsley area →
- Little Hulton area →
- Farnworth area →
- Little Lever area →
- Astley area →
- Tyldesley area →
- Westhoughton area →
- Higher Folds area →
- Wingates area →
- Atherton area →
- Hunger Hill (Bolton) area →
- Chew Moor area →
- Ainsworth area →
- Horwich area →
- Bolton (Bolton) area →
- Hindley area →
- Middle Brook waterbody →
Check the official record
Public access to this outlet is unknown. Do not enter restricted land or use this page as a route guide.
Open official source ↗Other outlet records nearby
- Ladybridge Lane (Near Ladybridge Brow) CSOCurrent status unknown
United Utilities · Middle Brook
- Ladybridge Lane CSOCurrent status unknown
United Utilities · Middle Brook
- Chorley New Road / Devonshire Road CSOCurrent status unknown
United Utilities · Middle Brook
- Heaton Bridge CSOCurrent status unknown
United Utilities · Middle Brook
Questions about Chorley New Road CSO
- Who operates Chorley New Road CSO?
- United Utilities is the operator named in the annual record. The permit reference is 01BOL0097.
- Where does Chorley New Road CSO discharge?
- The source names Tributary of Middle Brook as the receiving water. This does not show how far a discharge travelled.
- How many times did Chorley New Road CSO spill in 2025?
- The 2025 return records 12 counted spill events and 19.8 hours of recorded discharge. Spills are counted with the 12/24-hour method, so this is not a count of every start signal.
- Can I trust the 2025 figures for this outlet?
- The monitor worked for 86% of the reporting period. Below 90%, some events can be missed, so the count and hours may understate activity.
- Is Chorley New Road CSO discharging right now?
- This record is linked to a company live feed. The panel above shows the latest report we hold, with its date. That report can be old, and the monitor can be offline, so check the date before relying on it. A report that no discharge is taking place is not a water-quality result.
- How accurate is the map marker?
- The marker comes from the grid reference in the official annual return, which is accurate to about 1 metres. It shows the recorded outlet position, not the extent of any discharge.
- What kind of outlet is Chorley New Road CSO?
- The annual return lists the asset type as “SO on sewer network”, which means storm overflow on the sewer network. The return places this overflow on the sewer network.
- How does Chorley New Road CSO compare with other overflows?
- Chorley New Road CSO recorded 12 spills in 2025. That is more than 51% of the 14,239 overflows in England with a reported figure, and ranks 6,643rd nationally. Among United Utilities overflows it ranks 1,213th of 2,270; the median United Utilities overflow recorded 15 spills. On the Middle Brook waterbody it ranks 20th of 46. Ranks compare counted spill events only. They do not compare volume or harm.
- Does zero spills mean the water was safe?
- No. A zero means the annual return recorded zero counted spill events for this outlet and year. It is not a water-quality test, and pollution can come from other sources.