Sewage Map

Best Beech Hill CEO - 110713

Storm overflow operated by Southern Water. The source names Tributary of Bartley Mill Stream as the receiving water.

15
Spills in 2025
80.2
Recorded hours
100%
Monitor operation
5
Years listed

The reported spill count was 10 lower than in 2024. This compares event counts, not discharge volume.

Current status unknown

Checking the latest monitor report…

Open official annual data ↗

How it compares in 2025

Best Beech Hill CEO - 110713 recorded 15 spills in 2025. That is more than 56% of the 14,239 overflows in England with a reported figure, and ranks 5,981st nationally. Among Southern Water overflows it ranks 336th of 975; the median Southern Water overflow recorded 7 spills. On the Bartley Mill Stream waterbody it ranks 4th of 4.

GroupRank by spillsMedian spillsMedian hours
This outlet–1580.2
England5,981st of 14,2391122.3
Southern Water336th of 975717
Bartley Mill Stream4th of 41975.5

Rank 1 has the most spills. Equal counts share a rank. Only overflows with a reported count are ranked. Counts do not measure volume, so a higher rank does not mean more sewage.

Annual spill history

242021152022232023252024152025
From 2021 to 2025, the reported count went from 24 to 15 spills. The highest count was 25 in 2024 and the lowest was 15 in 2022.
YearSpillsDurationMonitor operationSource
20251580.2 hours100%Official data
202425139.9 hours100%Official data
202323114.9 hours99.7%Official data
20221586 hours99.1%Official data
202124112.5 hours100%Official data

A missing figure means the source did not provide a usable value. A zero is shown as zero. Monitor operation below 90% can make comparison less reliable.

Outlet details

Water company
Southern Water
Outlet type
Storm discharge at a pumping station
Permit
A01115
Activity reference
Storm
Grid reference
TQ6157031550
Waterbody ID
GB106040018240Official waterbody record ↗
Location source
Official annual grid reference
Location precision
About 1 metres
Location note
Unknown

About the name and type

The annual return lists this asset as “Storm discharge at pumping station”: storm discharge at a pumping station. The overflow is at a pumping station that moves sewage through the network.

The source name includes CEO, which Southern Water defines as Combined Emergency Overflow. The name and the listed type are separate source fields, so the name does not describe the layout of the site. Southern Water flow and spill reporting glossary ↗

The waterbody link opens the Environment Agency record for the exact ID in the return. It is a source lookup; we do not import its classification.

Where it is

The recorded position is about 1.4 km west of the Wadhurst reference point in the ONS built-up areas data.

Area and water pages

Check the official record

Public access to this outlet is unknown. Do not enter restricted land or use this page as a route guide.

Open official source ↗

Other outlet records nearby

Questions about Best Beech Hill CEO - 110713

Who operates Best Beech Hill CEO - 110713?
Southern Water is the operator named in the annual record. The permit reference is A01115.
Where does Best Beech Hill CEO - 110713 discharge?
The source names Tributary of Bartley Mill Stream as the receiving water. This does not show how far a discharge travelled.
How many times did Best Beech Hill CEO - 110713 spill in 2025?
The 2025 return records 15 counted spill events and 80.2 hours of recorded discharge. Spills are counted with the 12/24-hour method, so this is not a count of every start signal.
Can I trust the 2025 figures for this outlet?
The monitor worked for 100% of the reporting period, so the annual figures cover most of the year. They still do not measure discharge volume.
Is Best Beech Hill CEO - 110713 discharging right now?
This record is linked to a company live feed. The panel above shows the latest report we hold, with its date. That report can be old, and the monitor can be offline, so check the date before relying on it. A report that no discharge is taking place is not a water-quality result.
How accurate is the map marker?
The marker comes from the grid reference in the official annual return, which is accurate to about 1 metres. It shows the recorded outlet position, not the extent of any discharge.
What kind of outlet is Best Beech Hill CEO - 110713?
The annual return lists the asset type as “Storm discharge at pumping station”, which means storm discharge at a pumping station. The overflow is at a pumping station that moves sewage through the network. The source name includes CEO, which Southern Water defines as Combined Emergency Overflow. The name and the listed type are separate source fields.
How does Best Beech Hill CEO - 110713 compare with other overflows?
Best Beech Hill CEO - 110713 recorded 15 spills in 2025. That is more than 56% of the 14,239 overflows in England with a reported figure, and ranks 5,981st nationally. Among Southern Water overflows it ranks 336th of 975; the median Southern Water overflow recorded 7 spills. On the Bartley Mill Stream waterbody it ranks 4th of 4. Ranks compare counted spill events only. They do not compare volume or harm.
Does zero spills mean the water was safe?
No. A zero means the annual return recorded zero counted spill events for this outlet and year. It is not a water-quality test, and pollution can come from other sources.